Satigny School
Our company is the successful bidder for a wood-metal window project, i.e. the extension of the Satigny school-mayor complex in Geneva
With the Timothée Giorgis architectural firm in Geneva
And the BCS design office in Neuchâtel 
This important mandate is in production: delivery is scheduled for late 2016 and 2017
This project has the following specific features:
- Wood-metal window Meko 32
 - Motorized sliding system
 - Motorized opening with anti-finger pinch system
 - Opening classrooms with protected openings
 - Very large fixed glazed windows from the outside
 - Pole-and-transom system
 - More than 37 double-leaf doors opening outwards, with anti-panic system
 
